A practical installation sequence from site readiness to commissioning.
Check dimensions, structure, access, power distribution, ventilation and cable routes before cabinets arrive.
Establish level and alignment early, then verify cabinet flatness and locking before expanding the wall.
Label circuits and network paths so commissioning and future diagnosis remain understandable.
Save receiving-card files, screen connection diagrams, brightness settings and controller configuration with the project record.